The priorities of a housing association and a residential block manager, or operator of a residential estate, are different to that of a commercial property owner. Here the resident is primary, the asset is secondary and the investment committee comes third. This is the exact reverse priority as pretty much every other commercial property development can take place under.
Furthermore, the nature of the task takes place entirely within a regulatory arena that simply does not exist for commercial property, with considerations such as tenant approval, structure of lease, communal lease, and the residential energy regime (all defining the limits of any operation even before a technical discussion takes place).
Arc Renewables does engage with registered providers, large private landlords and residential blocks subject to all of the above, remaining entirely fee paid and at arm’s length throughout, defining every recommendation on its impact on the resident, Fuel Poverty and the very long time horizon of any residential holding.
Feasibility for a communal PV rooftop differs from a commercial feasibility study, because the roof isn't the only constraint that has to be worked around. Communal lease arrangements and consent issues define what is possible just as much as the building itself. This typically includes:
With housing associations and landlords with many blocks or on an entire estate the debate becomes not "can we technically make it work" but "what do we invest money in first". Estate-wide strategy work entails:
The leaseholder consent is very important for community energy schemes within an apartment building, getting this step wrong can halt or completely dismantle a project no matter how technically sound it is. This project addresses: